Ridge & Ember

The questions we are actually asked

Grouped by what people ask first. If yours is not here, message us — we answer on WhatsApp faster than by email.

Do you build outside Kigali?

Yes — Rubavu and Karongi on Lake Kivu, Musanze and Kinigi for the volcano lodges, Nyungwe, Akagera, Huye. Upcountry work is scheduled in blocks so the travel cost is shared between sites in the same week.

How long does a sauna take from order to first session?

Six to ten weeks for a standard cabin once the drawing is signed, and three to four if we already have the section in stock. The long pole is imported timber: 35–42 days at sea plus 5–10 days overland from Mombasa or Dar es Salaam (Sino Shipping).

Can you work with our architect?

Gladly, and the earlier the better. The three things we need in the build drawing are a drain with a fall, a mechanical extract route and a cable run to the board. Everything after that is finishes.

Do you service equipment you did not install?

Yes, if parts are obtainable. Roughly half our service calls are for somebody else's installation.

What does it cost to run?

A 9 kW heater pulls full load for the twenty to forty minute heat-up, then cycles at a third to a half of nameplate — an evening is closer to 4–6 kWh than to 9. A chiller in Kigali runs less than the same unit would at the coast because the nights are cool.

Is there a warranty?

Two years on our build and workmanship, and the manufacturer's terms on heaters, generators and chillers, which we register for you. Service visits keep both valid.

Can a sauna be moved when a lease ends?

Yes — we build a demountable specification with a bolted frame and a single service connection point. It is the standard in Kacyiru, where most housing is on corporate leases.

Which languages do you work in?

English and Kinyarwanda. Drawings, quotes and the operating manual come in whichever you prefer.

How long does a custom sauna take in Rwanda?

Six to ten weeks for a standard cabin once the drawing is signed. The imported timber is the long pole: sea freight to Mombasa or Dar es Salaam runs 35–42 days, then 5–10 days overland to Kigali. If we have the section in stock at the Gisozi workshop, it is three to four weeks.

Can a sauna run on single-phase power?

Up to about 8 kW, yes, if the house supply and cable can carry it. Above that we ask for a three-phase connection — REG supplies 400 V three-phase and the meter fee is the same RWF 56,000 for single or three phase, so the cost is in the cabling, not the meter.

Wood-fired or electric?

Electric for anything in the city: it is controllable, it does not need a flue through a tiled roof, and nobody has to carry wood up a terrace. Wood-fired makes sense at a lodge in Musanze or on Lake Kivu where the fire is part of the evening and firewood is already on site.

Does a garden sauna need a foundation?

On a level terrace, a basalt or brick plinth is enough. On a slope, we use galvanised steel posts fixed into the retaining wall and level the floor frame off them — no new concrete platform, no load added to a wall that is already retaining soil.

How does the cabin get to a hillside plot?

In panels, carried by hand where a truck cannot turn. On the narrow red-earth streets in Kiyovu and Rebero, a flatbed parks at the nearest turning point and the crew walks the wall panels down. We check the route on the site visit and price it honestly.

Will the timber go grey?

Pale timber will silver on the sun side within two or three years unless it is re-oiled. Charred timber holds its colour far longer. Neither affects the structure — it is a look, and we tell you which one you are choosing.

Is infrared as good as a real sauna?

It is a different thing. You will sweat, you will sleep better, and you will not get the 90 °C heat or the löyly. If you have the power and the space, build the real cabin. If you do not, an infrared cabin you actually use beats a Finnish sauna you cannot install.

Can it go on a balcony?

On a covered balcony, yes, with a sheltered socket. Open to the rain, no — the panels and the control board are not built for it.

How much does it add to the electricity bill?

At around 2 kW for forty minutes, a session is roughly 1.3 kWh. Check your current REG tariff band and multiply — it is closer to running a kettle than to running an air conditioner.

Can you convert an existing bathroom into a steam room?

Sometimes. It needs a drain, a serviceable spot for the generator within about 10 m, and a ceiling we can pitch. What it almost always needs is stripping back to the slab — tiling over an existing floor that has no fall is how you buy the problem twice.

Steam room or sauna for a hotel in Kigali?

Guests from the region ask for steam more often; guests from Europe ask for sauna. A hotel with one thermal room usually does better with steam; with two rooms, build both and put the cold plunge between them.

How long does the tanking take to cure?

The membrane wants a full day between coats and a day before tiling. We do not compress that. A steam room finished in a hurry leaks in the second rainy season.

Still stuck?

Ask us directly

WhatsApp usPrices